| Collingwood Public Utilities Water Rates 2009-2010 |
|
|
|
| Wednesday, 16 December 2009 | |
|
WATER CHARGES: (Effective January 1, 2010) WATER TURN ON/OFF Normal Hours: $27.50 After Hours: Billing will be based on full cost recovery. MONTHLY WATER CONNECTION CHARGE 2009 2010 Municipal water service to location - up to 1 1/4" line: $ 18.17 $ 18.62 Municipal water service to location - 1 1/4" line: $ 22.94 $ 23.52 Municipal water service to location - 1 1/2" line: $ 34.82 $ 35.69 Municipal water service to location - 2" line: $ 51.22 $ 52.50 Municipal water service to location - 3" line: $ 76.61 $ 78.52 Municipal water service to location - 4" line: $ 116.10 $ 119.00 Municipal water service to location - 6" line: $ 174.49 $ 178.85 Municipal water service to location - 8" line: $ 232.17 $ 237.97 Municipal water service to location - 10" line: $ 348.97 $ 357.69 FILTERED WATER CONSUMPTION CHARGE (per cubic metre) 2009 2010 Residential : per CuM .................................................................................. $0.54 $0.554 Residential :(for each cubic meter above 40CuM during) (May, June, July, August, September) ........................................ $0.80 $0.82 Commercial / Industrial : per CuM ..............................................................$0.54 $0.554 FILTERED WATER CONSUMPTION CHARGE (UNMETERED - Flat Rate) (2009 & 2010) $ 30.00 First Month $ 45.00 Second Month (Note: Rate increases by 50% for each month until meter installed and operational) PROCESS WATER (unfiltered) CONSUMPTION CHARGE (per cubic metre) 2009 2010 Industrial : per CuM ......................................................................................................... $0.17 $0.174 WATER FROM HYDRANT 2009 2010 Private Pool or other large container - Flat fee for use of hydrant : $135.00 $135.00 (Note: Customer must provide their own fire hose) CONSTRUCTION WATER SUPPLY 2009 2010 Flat fee per construction unit :....................... $50.00 $50.00 BULK WATER SALES FROM FILTRATION PLANT 2009 2010 Private or Commercial User : per cubic meter :............... $1.00 $1.00 Municipal User : per cubic meter charge based on municipal customer's current usage rates WATER METERS 2009 2010 Water Meter Purchase - Up to 3/4":... $126.00 $126.00 Water Meter Purchase - Over 3/4": (Non-Stock - Call office for pricing) WATER SERVICE CONNECTION CHARGES (2009 & 2010) Highway #26 East Watermain Project :............. $ 5,010.74 per connection plus $ 164.75 per meter of frontage Silver Creek Drive Improvement Project :.......... $ 101.49 per meter of frontage Osler Bluff Road Improvement Project :............ $ 181.65 per meter of frontage (max 60.96 m) plus water meter charge Mountain Road Trunk Water Main Connection :...... $ 4,326.00 (includes water meter) Raglan Street South :............................ $ 117.01 per meter of frontage plus water meter charge OTHER SERVICES AVAILABLE Billing Based on Full Cost Recovery Water Service Installation or Repair Inspection Water Main Chlorination and Bacteria Testing Water Service Thawing Disconnection of Water Service at Main Temporary Removal and Re-installation of Meter |
|
| Last Updated ( Wednesday, 16 December 2009 ) |


