General Contractor Information

General Contractor requirements and Material Specifications for Municipal Subdivisions

A Lineman working in an extended bucket

Table of Contents (You can download the full text of this document below.)
 
1.0 Contractor Approval
2.0 Inspection
3.0 Inspection Costs
4.0 Cable Termination & Testing
5.0 Termination Costs
6.0 Hipot Testing Costs
7.0 Material Specifications
7.1 Secondary Cables
7.2 Primary Cables – Main Express Feeders (3-Phase)
7.3 Primary Cables – Local Feeders (Single Phase)
7.4 Conduit Specifications for Secondary Cables (Kortech)
7.5 Conduit Specifications for Primary Cables
7.6 Cable Fault Current Indicators
7.7 Transformers – Single Phase
7.8 Transformers – Three Phase
7.9 Primary Switching Cubicle (Pad-mounted)
 
 