Customer Care
Conservation
Collingwood Public Utilities Water Rates 2010
(Effective January 1, 2012)
Water Turn On/Off
Normal Hours: $27.50
After Hours: Billing will be based on full cost recovery.
Monthly Water Connection Charge
Municipal water service to location |
2009 |
2010 |
2011 |
2012 |
| up to 1 1/4" line | $18.17 | $18.62 | $18.99 | $19.37 |
| 1 1/4" line | $22.94 | $23.52 | $23.99 | $24.47 |
| 1 1/2" line | $34.82 | $35.69 | $36.40 | $37.13 |
| 2" line | $51.22 | $52.50 | $53.55 | $54.62 |
| 3" line | $76.61 | $78.52 | $80.09 | $81.69 |
| 4" line | $116.10 | $119.00 | $121.38 | $123.81 |
| 6" line | $174.49 | $178.85 | $182.43 | $186.08 |
| 8" line | $232.17 | $237.97 | $242.73 | $247.58 |
| 10" line | $348.97 | $357.69 | $364.85 |
$372.15 |
Filtered Water Consumption Charge (per cubic metre)
Residential : $0.576 per CuM
Residential : $0.853 per CuM (for each cubic meter above 40CuM during May, June, July, August, September)
Commercial / Industrial : $0.576 per CuM
Filtered Water Consumption Charge (UNMETERED - Flat Rate)
$30.00 First Month
$45.00 Second Month
(Note: Rate increases by 50% for each month until meter installed and operational)
Process Water (unfiltered) Consumption Charge (per cubic metre)
Industrial : $0.182 per CuM
Water From Hydrant
Private Pool or other large container - Flat fee for use of hydrant : $150.00
(Note: Customer must provide their own fire hose)
Construction Water Supply
Flat fee per construction unit : $ 50.00
Bulk Water Sales From Filtration Plant
Private or Commercial User : $ 1.70 per cubic meter
Municipal User : $ per cubic meter charge based on municipal customer's current usage rates
Water meters
Water Meter Purchase - Up to 3/4": $192.00 ($50.00 credit will be provided once meter is installed by a CPU employee and spacer kit is returned)
Water Meter Purchase - Over 3/4": $ (Non-Stock - Call office for pricing)
Water Service Connection Charges
Highway #26 East Watermain Project
$5010.74 per connection plus $164.75 per meter of frontage
Silver Creek Drive Improvement Project
$101.49 per meter of frontage
Osler Bluff Road Improvement Project
$181.65 per meter of frontage (max 60.96 m) plus water meter charge
Mountain Road Trunk Water Main Connection
$4,326.00 (includes water meter)
Raglan Street South
$117.01 per meter of frontage plus water meter charge
Other Services Available
Billing Based on Full Cost Recovery
- Water Service Installation or Repair Inspection
- Water Main Chlorination and Bacteria Testing
- Water Service Thawing
- Disconnection of Water Service at Main
- Temporary Removal and Re-installation of Meter